CEMENT--GROUTS 526 Star Portland Cement, with Plaster. [40 per cent water. Remained in the mixing bed 6£ hours.] Dimensions. Sectional area. First crack. Compressive strength. Remarks. Height. Compressed surface. Total. ; Per square inch. Inches. Inches. Inches. Sq. inches. Pounds. Pounds. ! Pounds. 4.05 3.94• 4.14 16.31 63,600 66,500 4,077 4.05 3.94 4.13 16.27 52,000 67,400 4,143 4.00 3.96 4.20 16.63 71,700 71,700 4,311 4.04 3.97 4.24 16.83 74,700 74,700 4,439 [60 per cent water. Remained in the mixing bed 11 hours.] 3.97 4.20 3.93 16.51 33,500 2,029 4.03 4.15 3.92 16.27 31,300 1,924 4.01 4.08 3.94 16.08 33,100 2,058 4.00 4.14 3.94 16.31 32,400 1,987 4.03 4.15 3.94 16.35 27,700 1,694 [80 per cent water. Remained in the mixing bed 34 hours.] 4.08 4.00 4.07 16.28 25,100 1,542 4.00 4.06 3.99 16.20 14,000 21,200 1,309 4.03 4. 00 4.10 16.40 25,700 1,567 4.03 4.00 4.03 16.12 26,100 1,619 4.03 4.00 4.05 16.20 25,900 1,599 [100 per cent water. Remained in the mixing bed 45 hours.] 3.99 4.01 4.11 16.48 22,700 24,100 1 462 4.00 4.01 4.07 16.32 20,200 1 238 3.97 4.05 4.00 16.20 20,100 1 241 3.98 4.02 4.00 16.08 21,500 22,300 1 387 4.00 4.00 4.05 16.20 22,800 1 407