503 CEMENT--RETARDED SETS. Steel, Slag, Cement. RETARDED SET SERIES. Samples taken out at 2-hour intervals. Main batch of cement allowed to rest undisturbed in the mixing bed between the times of taking out samples, or when regauging. Age when tested, 31 days. Original quantities: Pounds. Cement......................................................................80.5 Water/........................................................... 36 per cent= 29 Water added to the main batch as follows: Water used. Interval after mixing, hours. Pounds. Per cent, approximate. 29.0 36.0 2 0.5 36.9 4 0.5 38.5 6 0.5 40.0 8 0.25 40.5 Hours. Dimensions. Sectional area. First crack. Compressive strength. Remarks. Height. Compressed surface. Total. Per square inch. Inches. Inches. Inches. Sq. inches. Pounds. Pounds. Pounds. 0 5.98 6.04 6.00 36.24 42,700 42,700 1,178 0 6.02 6.02 5.96 35.88 41,100 41,500 1,156 2 6.06 6.07 6.03 36.60 40,600 41,400 1,131 4 6.00 6.04 6.10 36.84 38,800 38,800 1,053 4 6.04 6.00 6.05 36.30 36,000 36,900 1,016 6 6.02 6.04 6.00 36.24 36,400 36,400 1,004 8 6.03 6.00 6.08 36.48 32,300 35,100 962 8 4.03 4.01 3.88 15.55 11,900 13,500 868